Microsoft Project vs Oracle Primavera P6 Enterprise Project Portfolio Management
Put any two products side by side: specification, the six criteria and the EPC Index needle.
FIG. 050
Microsoft Project
Microsoft · Planning, Scheduling & Risk
The ubiquitous scheduler for subcontractor and supplier programmes, rarely the contract master on major EPC projects.
FIG. 067
Oracle Primavera P6 Enterprise Project Portfolio Management
Oracle · Planning, Scheduling & Risk
Still the contractual standard for EPC scheduling. Few projects can avoid it; the question is how well you run it, not whether.
- 6Capability25%9
- 7Interoperability20%8
- 5Scale15%10
- 8Usability15%5
- 6Deployment10%7
- 9Ecosystem15%10
| Attribute | Microsoft Project | Oracle Primavera P6 Enterprise Project Portfolio Management |
|---|---|---|
| Vendor | Microsoft | Oracle |
| Category | Planning, Scheduling & Risk | Planning, Scheduling & Risk |
| Status | Active | Active |
| Deployment | Desktop | On-premises · SaaS |
| Licensing | n/a | n/a |
| Standards | n/a | XER/XML schedule exchange |
| Strengths |
|
|
| Considerations |
|
|
§ 02
Popular match-ups
The two leading products in each category, ready to compare.
- AVEVA E3D DesignvsOctave Forte 3D
- Octave Facets P&IDvsAVEVA P&ID and Diagrams
- Octave Facets InstrumentationvsEplan Electric P8
- Aspen HYSYSvsAspen Plus
- Octave Aspect Pipe StressvsTekla Structures
- Aspen Capital Cost EstimatorvsInEight Estimate
- Oracle Primavera P6 Enterprise Project Portfolio ManagementvsOracle Primavera Cloud
- Octave Loop CorevsSAP Ariba
- Oracle AconexvsProjectWise
- ProcorevsForma Build
- NavisworksvsLeica Cyclone
- Cognite Data FusionvsOctave InConcert