AVEVA PRO/II Simulation
by AVEVA
Sequential-modular steady-state process simulator with long use in refining and petrochemicals for heat and material balances. AVEVA offers it alongside AVEVA Process Simulation, which it positions as the future of its design simulation line.
Specification
- Vendor
- AVEVA · Schneider Electric
- Categories
- Process Simulation
- Phase
- EEngineering
- Status
- Active
- Deployment
- Cloud · On-premises
- Licensing
- Commercial licence
- Standards
- None documented
- Former names
- PRO/II Process Engineering
- Official site
- aveva.com
Capabilities
- aRigorous steady-state heat and material balances
- bRefinery reactor models (FCC, hydrocracker, reformer, coker)
- cDistillation, heat exchanger and solids models
- dExcel, HTRI and OLI integration
- eScope 1 and 2 emissions and economics
Assessment
A proven steady-state workhorse for refining, now positioned as the predecessor to AVEVA Process Simulation. Good for existing models; plan the long-term path.
-
Capability25%8/10
Rigorous steady-state heat and material balances with refinery reactor models and distillation strength.
-
Interoperability20%6/10
Integrations with Excel, HTRI and OLI; limited live links to engineering design tools.
-
Scale15%8/10
Long used on refinery and petrochemical design work.
-
Usability15%6/10
Mature but older interface conventions.
-
Deployment10%6/10
Available on-premises and through AVEVA's cloud.
-
Ecosystem15%7/10
Established user base in refining, with AVEVA steering new work towards Process Simulation.
Strengths
- Refinery reactor models
- Long track record
- HTRI and OLI integrations
Considerations
- Successor product is AVEVA's strategic focus
- Steady-state only
- Older interface
Editorial assessment from public documentation, 23 October 2026. Not a hands-on benchmark. Methodology
In the same circuit · Process Simulation
- 01 84
- 02 81
- 03 77
- 04 73
- 05 71
- 06 71
- 07 70
- 08 70
- 09 68
- 10 67
- 11 62
Connected to
Documented integrations and data exchange, in either direction.
Sources
- AVEVA PRO/II SimulationAVEVA · accessed 22 October 2026
- AVEVA Process SimulationAVEVA · accessed 22 October 2026
Plate updated 22 October 2026 · revision 1