Octave Forte 3D
by Octave
Data-centric 3D design system for process plants, power plants and other industrial facilities, scaled for large multi-office projects and sustaining work. Developed by Hexagon as Intergraph Smart 3D and renamed after the business was spun off as Octave in 2026.
Specification
- Vendor
- Octave
- Categories
- 3D Plant Design
- Phase
- EEngineering
- Status
- Active
- Deployment
- Desktop
- Licensing
- Commercial licence
- Standards
- None documented
- Former names
- Intergraph Smart 3D, SmartPlant 3D, Hexagon Smart 3D
- Official site
- octave.com
Capabilities
- aRule-driven 3D design to limit errors and rework
- bConcurrent multi-user, multi-site design
- cGlobal reuse of engineering data
- dCross-discipline design review
- ePoint-cloud integration via CloudWorx for Forte 3D
Assessment
Intergraph Smart 3D under a new name, and still one of the two benchmark plant design systems for large EPC work. Choose it where the owner or the rest of the toolchain is Octave/Intergraph-based.
-
Capability25%9/10
Rule-driven, data-centric 3D design for process, power and marine facilities with strong piping, structure and equipment modelling.
-
Interoperability20%7/10
Well connected to Octave's P&ID, instrumentation, stress and information-management tools; wider exchange relies on established formats and partners.
-
Scale15%10/10
Concurrent multi-user, multi-site design and global data reuse are core to the product and proven on major EPC programmes.
-
Usability15%6/10
Rich and rule-heavy; teams need sound reference data and administration to keep it productive.
-
Deployment10%7/10
Traditionally deployed on-premises with hosted and work-share options; cloud packaging is less prominent than its rival's.
-
Ecosystem15%9/10
Long-standing peer of AVEVA E3D in owner specifications, with an experienced user base inherited from Intergraph Smart 3D.
Strengths
- Rule-driven design that catches errors early
- Mature global work-share
- Integrated with Facets P&ID and Aspect Pipe Stress
Considerations
- Rebrand to Octave adds a period of name and packaging change
- Significant reference-data and administration effort
- Smaller teams may find it heavier than needed
Editorial assessment from public documentation, 23 October 2026. Not a hands-on benchmark. Methodology
In the same circuit · 3D Plant Design
- 01 82
- 02 81
- 03 74
- 04 71
- 05 68
- 06 65
- 07 61
- ·· n/a
- ·· n/a
Connected to
- Octave Facets P&IDOctave
- Octave Aspect Pipe StressOctave
- Octave Facets ElectricalOctave
Documented integrations and data exchange, in either direction.
Sources
- Octave Forte 3DOctave · accessed 22 October 2026
- Product namingOctave · 8 April 2026 · accessed 22 October 2026
Plate updated 22 October 2026 · revision 1